{"id":2323,"date":"2025-10-20T10:30:32","date_gmt":"2025-10-20T08:30:32","guid":{"rendered":"https:\/\/brnojedna.cz\/bydleni\/?p=2323"},"modified":"2025-10-15T12:26:19","modified_gmt":"2025-10-15T10:26:19","slug":"brno-jedna-co-se-deje-pod-zemi","status":"publish","type":"post","link":"https:\/\/brnojedna.cz\/bydleni\/en\/brno-jedna-co-se-deje-pod-zemi\/","title":{"rendered":"Brno Jedna: What\u2019s Happening Underground"},"content":{"rendered":"<p>At the Brno Jedna site, work is currently focused on securing the construction pit using a tied, pre-drilled pile wall and on excavating a total of 15,000 m\u00b3 of soil. This excavation will make room for two underground floors of the XENON and NEON buildings. To put that into perspective, it\u2019s roughly the amount of soil needed to fill Square of Svobody up to the roofs of trams \u2013 or enough to fill six Olympic-size swimming pools.<\/p>\n<p>Before the main works could begin, it was necessary to relocate utility networks, demolish the original building, and set up the construction site. Now, however, the heavy machinery is fully engaged, digging deep into the ground as the foundations of the new multifunctional district begin to take shape.<\/p>","protected":false},"excerpt":{"rendered":"<p>Na stavb\u011b projektu Brno Jedna\u00a0pr\u00e1v\u011b prob\u00edhaj\u00ed pr\u00e1ce na zaji\u0161t\u011bn\u00ed stavebn\u00ed j\u00e1my\u00a0pomoc\u00ed kotven\u00e9 p\u0159edvrt\u00e1van\u00e9 pilotov\u00e9 st\u011bny\u00a0a tak\u00e9 v\u00fdkop j\u00e1my o objemu 15 000 m\u00b3, kter\u00e1 p\u0159iprav\u00ed prostor pro dv\u011b podzemn\u00ed podla\u017e\u00ed dom\u016f XENON\u00a0a NEON. To je p\u0159ibli\u017en\u011b tolik zeminy, kolik by sta\u010dilo na zasyp\u00e1n\u00ed n\u00e1m\u011bst\u00ed Svobody po st\u0159echy tramvaj\u00ed, nebo na napln\u011bn\u00ed \u0161esti olympijsk\u00fdch baz\u00e9n\u016f. Ne\u017e [&hellip;]<\/p>","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2323","post","type-post","status-publish","format-standard","hentry","category-nezarazene"],"acf":[],"_links":{"self":[{"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/posts\/2323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/comments?post=2323"}],"version-history":[{"count":2,"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/posts\/2323\/revisions"}],"predecessor-version":[{"id":2326,"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/posts\/2323\/revisions\/2326"}],"wp:attachment":[{"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/media?parent=2323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/categories?post=2323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brnojedna.cz\/bydleni\/en\/wp-json\/wp\/v2\/tags?post=2323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}